EBK Carpentry
Structural carpentry

Structural steel, installed properly

5.0Average Google review

Beams, posts and lintels supplied and installed as part of framing and wall removal work, coordinated with your engineer's specification.

Get a Free Quote

How can we reach you?

1 / 2
  • Licensed & insured
  • Sydney-wide
  • Free quotes

When does a job need structural steel instead of timber?

Steel takes over when the span is too long or the load too heavy for timber to handle in a sensible depth. A steel universal beam does the same work as a much deeper timber member, which is why it is the usual answer for wide openings, supporting a storey above, or where the beam has to sit flush in the ceiling.

At a glance

  • Sections: Universal beams (UB), universal columns (UC), parallel flange channels (PFC), SHS posts and steel lintels.
  • Designed by: Your structural engineer. We install to the drawing, we don't substitute sections.
  • Typical use: Wide openings, wall removals, supporting a storey above, long-span structures.
  • Access: Assessed before ordering, not on delivery day.
  • Area: Sydney-wide, from a base in Dulwich Hill
Before anything is ordered

The four questions that decide the job

  1. How far does it span?

    The dominant input. Span decides the section, and the section decides almost everything else about cost and handling.

  2. What is it carrying?

    Ceiling only is the light end. A floor above is more. A floor plus roof, or a whole storey, is more again.

  3. How much depth is available?

    Whether the beam can sit flush inside the floor structure or has to hang below the ceiling. Usually the constraint that forces steel over timber.

  4. How does it physically get there?

    Crane, gantry or hand-carry. On tight Sydney sites this genuinely shapes the engineering, so it belongs at design stage.

What's included

What the work involves

  • Beams, posts and lintels

    Universal beams, universal columns, parallel flange channels, SHS posts and steel lintels, sized by your engineer and installed to their detail.

  • Getting steel into the building

    The logistics are half the job. Crane access, carrying a beam through a terrace, or getting it up to a first floor all need planning before the steel is ordered.

  • Bearing, packing and levelling

    Steel is only doing its job if it is level and fully bearing at each end. Packing and setting the beam properly is what stops movement showing up in the ceiling six months later.

  • Connections and fixings

    Bolted and fixed to the engineer's detail, with timber connected to steel the way the drawing specifies rather than the way that's quickest.

  • Timber packers for the next trade

    Steel doesn't take fixings, so we bolt packers to the sections where following trades need to fix into them. A small thing that saves a lot of improvisation.

The real constraint

Steel is a logistics problem before it's a carpentry problem

A four-metre universal beam is not something you carry through a hallway. Before a section is ordered, the questions that need answering are how it gets to the opening, what it lands on at each end, and whether the floor between the front door and the room can take it on the way through.

On tight Sydney sites this genuinely shapes the engineering. If a single long beam cannot physically be delivered into position, the engineer may specify a different arrangement: a spliced beam, a pair of smaller sections bolted together in place, or an intermediate post.

Where jobs fail

Bearing is what fails, not the beam

Steel beams do not generally fail. What causes problems is what they are sitting on.

The load arriving at each end of that beam is now concentrated into a very small area, and it has to continue down through whatever is beneath it (brickwork, a post, a floor structure) to something that can take it. Where jobs go wrong is a beam bearing onto a couple of courses of old brickwork, or a post landing mid-span on a floor joist rather than over a bearer or pier.

That load path is part of the engineer's design, and following it exactly is most of what “installed properly” means.

How we work

How a steel job runs

  1. 01

    Review the engineering

    We read the structural drawings and check them against the site, particularly bearing points and access, before anything is ordered.

  2. 02

    Order and schedule

    Steel is fabricated to size and delivered to a date that fits the rest of the build, with lifting sorted in advance.

  3. 03

    Prop, place, fix

    Existing structure propped, steel positioned, packed and fixed to the detail, with the load transferred once everything is permanently supported.

  4. 04

    Sign-off ready

    Left in a state your engineer or certifier can inspect, with the surrounding timber work completed around it.

Ready when you are

Get a quote on your steel

Send through your engineer's drawings and we'll quote from them. Free, itemised, and no obligation.

  • Free, no-obligation quote
  • Licensed & insured
  • Sydney-wide
FAQs

Steel questions

Not covered here? Call 0420 223 223 and ask. We'd rather answer it than have you guess.

When is steel necessary rather than timber?
Broadly, when a timber member deep enough to do the job won't fit, or doesn't exist in a practical size. Wide openings across a living space, beams carrying a storey above, and flush beams that have to sit inside a shallow floor depth are the three cases that come up most often. Your engineer makes the call based on span and load.
How does the steel get into the house?
That depends on the site, and it's worth resolving early. Options are a crane over the roof, a gantry or genie inside, or carrying it in by hand if the section is small enough. Sydney terraces and units are where this gets interesting, and it can influence whether the engineer specifies one long beam or a spliced pair.
Do you fabricate the steel?
We coordinate fabrication to your engineer's schedule and install it. Beams arrive cut to length with the required holes and plates already done.
Does steel need to be protected?
Internally, steel is typically primed and then either encased in plasterboard for fire and finish reasons or left exposed if that's the look you want. Anything in an exposed or external position needs a proper protective system specified for the environment. A primer coat is not enough near the coast.
Can a steel beam be hidden in the ceiling?
Usually, and it's one of the main reasons people choose steel. A shallow steel section can sit flush within the floor structure where a timber beam of equivalent capacity would hang below the ceiling. Whether it fits depends on the depth your engineer needs versus the depth available.
Do you work directly with builders?
Most of our steel work comes through builders as part of a larger job. We're used to slotting into a program and coordinating with the engineer and the other trades on site.
Request a quote

Tell us about the job

Send through your plans or a quick description of what you're after and we'll come back to you with the next steps. No obligation.

Start your quote

Which services do you need?

1 / 3
Which services do you need? Choose one or more.
0420 223 223